3x Cement tanker

2019 Aalborg White/Kongsdal/Norden

On order of the Royal Bodewes shipyard, we have supplied a series of cement tankers with complete electrical installations. The main engine powers the generator that in turn, supplies the loading and unloading system. During the unloading, the propeller shaft is disconnected. This process is controlled by the power management system (PMS) in combination with a Marex OSIII (Main Engine Control) System which we have designed and programmed.  In consultation with the ship owner, the bridge console is also designed and installed by Hoogendijk Electric.

Gross Tonnage: 2627

Deadweight: 4200 t

Length Overall x Breadth Extreme: 89.98m × 13m

Want to work at Hoogendijk Electric?